Hi!
I often wonder what to work on next, after a big finish. Of course there are many on the list. I looked back at my “100 days Hustle List” and wonder whether I’ll be able to achieve all the work to do that I’ve listed there. Today I thought I shall get myself some instant gratification – sewing something small.. like drawstring bags..this was on the list..
I didn’t get to link up the half way 100 day hustle over at Kelsey Sew, but I I think I still need to review it. So here is my review of my list…
But I am linking this to Sew Darn Crafty and Saturday Seven. Here is my updated list…
1) Jack Attack quilt – finish quilt top, quilt and bind (ON ITS WAY – NEED TO FINISH THE BACKING -MAYBE DONE BY THE END OF YEAR)
Piecing the backing of my Jack Attack Quilt:
2) Vintage Modern Heart Quilt : Quilt and bound (NOPE – NOT GOING THERE YET)
3) Emmaline Bag (DONE HERE)
4) Tote bag + Lunch Bag ( MADE TWO DRAWSTRING LUNCH BAGS TODAY)
5) Piece Happy Go Lucky Quilt (ON ITS WAY)
6) Start on Gingko Blues Wall Hanging – raw applique quilt (PROBABLY START BEFORE END OF YEAR)
7) Flower Power Pillow + Tutorial (NOT YET)
8) Mini Quilts : one or two (NOT YET EITHER)
9) Throw a Linky Party or Become a Swap Host (NOT YET TOO)
Well, I better get sewing!
Thanks for stopping by!
5 Comments
Sure love those lunch bags – is it a particular pattern?
You have a long list! The lunch bags look great!
Love the lunch bags with handles!
All of your bags are adorable! The Emmaline bag looks great!
Love those bags!